Disclosed weakness · no CVE recorded

LiteLLM budget boundaries could renew allowances too early

LiteLLM · LiteLLM Proxy · budget window scheduling

First documented disclosure · Review checkpoint

Summary

Timezone handling, elapsed-period rounding and repeated daylight-saving times could clear spending counters before the configured period ended.

Severity and exploitation evidence

No CVSS score recorded in this review.

Exploitation not established: Reviewed maintainer reports and controlled checks do not establish malicious exploitation against users.

Exploitation evidence source

Technical severity is not a measure of observed attacks or of risk to your deployment. Attempts, demonstrations, and successful compromise retain the qualifications in the source.

How the weakness works

Window due checks discarded timezone offsets; reset calculations lost multi-day offsets or re-aligned saved elapsed schedules, and calendar boundaries could repeat during a clock change.

Conditions required

An operator relies on affected budget windows: non-UTC offsets, multi-day elapsed durations, non-divisor durations such as 45m, or repeated local calendar reset times.

Potential impact

Spending allowances can reopen early or repeatedly, permitting more usage than the intended period limit. Positive timezone offsets can also delay resets.

Affected versions and configurations

Maintainer-controlled pre-fix snapshots are affected; a complete earlier release range is not established.

Fix and mitigation status

Prerelease 1.112.0-dev.2 lists PR53012, PR53020, PR53151 and PR53065. Reviewed tagged code retains UTC due checks and elapsed/calendar corrections; no stable release containing this combined correction was verified.

Practical next steps

Use a verified corrected build and inspect actual reset instants and retained spend across consecutive windows and daylight-saving changes. Review previously stored schedules separately.

Operating lesson

Store and compare authoritative budget boundaries consistently, including timezone and elapsed-period semantics.

Evidence and limits

This groups related boundary-accounting corrections disclosed November 20, distinct from the existing long-unit-spelling mismatch. Upstream reports controlled proxy and database checks; this review inspected source without executing them. Initial aligned windows can still be shorter than the nominal duration; unanchored multi-day app windows retain daily re-alignment. Legacy inline windows acquire calendar starts on rollover, and the multi-day offset fix does not rewrite already stored reset timestamps. No malicious exploitation or CVSS score was established.

Sources